English
  • 中文
  • English
图片展示

Technology and Quality

The company's R&D center is located in liuzhou headquarters, with more than 130 technical developers (including 10 from  zhuhai company), and more than 30 employees with more than 5 years' working experience.The company's current main  management system: wave ERP system;Main product development software: AutoCAD, UG, CATTIA, VESYS, EB, E3, CAPITAL,  etc.We have strong ability of technology development and technology transformation.In 2017, we have developed and mass  produced 16 projects for SGMW, DFLZ, GEELY, SAIC MAXUS, BYD ZOTYE and other customers, and another 51 projects are  under continuous development.

 

11 system engineers (5 senior engineers), 15 digital and analog engineers (5 senior engineers), 12 product engineers (6 senior engineers), and 90 process engineers (30 senior engineers)

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

图片展示

  

 

 

 

 

 

 

 

 

 

 

 

 

 

----Research & Development: Adopt APQP, FMEA, SPC process technology to predict the failure of products in advance, and  develop corresponding control and detection methods;CAE assisted analysis,3D environment  simulation, rapid prototyping verification, full performance test and other methods were used  for product verification and confirmation.

 

----Production,Applying various control way、

 

----Quality tool application:8D、5Why、5step、Cause-Effect Graphs、Pareto Diagram 、Multifunctional group analysis meeting,etc.

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

The company has 14 sets  of automatic crimping  machines, 7 sets of manual  crimping machines, 3  assembly lines and various  wire harness processing  equipment, which can  meet the production and  manufacturing of  complete vehicle wire  harness. At present, the  manufacturing capacity of  wire harness exceeds  150,000 sets/year.

  

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

Quality prevention, control, improvement

 

----Automatic connection machine error - proof automatic alarm control

The automation has a monitoring and alarming system, which can automatically detect the compression  ratio between the crimping terminal and the wire core. It can automatically alarm when it exceeds the  set range. It can also automatically alarm when the wire is not open properly

                                                                          (such as broken core wire,  bad peeling and line diameter discrepancy).

Slice Analysis

Terminal Cutting -> Grinding and polishing ->Caustic washing ->Photographic analysis

 

Compressibility=The total cross-sectional area of the crimpedback terminal and the core wire/The total cross-sectional area
of the crimped front terminal and the core wire x 100%

 

压接前的面积计算= N* *D2/4 + S*C1

 

Product test

Aiming at the abrasive tool blade wear condition, set the service life of the die blade, collect data  according to the number of press joints, input the computer to collect the data, and make  preventive maintenance regularly to ensure the quality of press joints.

 

   

 

 

 

 

 

 

 

Shuangfei has complete series laboratories,  divided into Liuzhou and Hefei two experimental  bases, more than 170 large-scale experimental  equipment. Each laboratory can independently  carry out all kinds of experiments required by the  production of wire harness. Liuzhou laboratory is authorized by SGM GP-10  laboratory, and has reached the experimental  standard of the Quality Supervision Bureau of the  autonomous region. Hefei laboratory has passed CNAS experimental  approval, which can meet the experimental  requirements of European, American, Japanese  and Korean car series.

 

图片展示

   

 

 

 

 

 

 

Cutting plan clearly stipulates the Cutting machine production tasks and production quantity for each  type during the plan period.The production activities of each type of machine should be carried out in  a planned and step-by-step way and BTO system should be adopted. Cutting

 

图片展示

   

 

 

 

 

 

 

 

 

 

 

The company adopts advanced wave ERP barcode scanning warehouse management system

图片展示

What problems does the pull card solve?:Bulk reduction、Direct management、Waste reduction、Visual communication

——General bulk transportation:
The mode of transportation is adopted for the mass production of products in stock, and the  transportation time is 72 hours to the outside warehouse;

——Rent automobile transportation:
We have a large amount of shipment. The mode of transportation is adopted when we reach the basic  cargo capacity of 5T vehicles. Generally, the goods will arrive within 24 hours;

——The bus express:
For small quantity products, such as sample line, urgent materials, customer's urgent needs, etc.;It
usually arrives within 24 hours;

——Air transportation:
For customers bidding farewell to the emergency, the requirement of the same day arrival of materials,  can take this way, but the cost is high, rarely used.

 

@copyright 2026 ZHUHAI SHUANGFEI ELECTRIC  SYSTEMS Co., Ltd.

Add WeChat friend to learn more about the product
Use Enterprise WeChat
"Scan" to join the group chat
Copy success!
Add WeChat friend to learn more about the product
I see.