防错技术
Technology and Quality
The company's R&D center is located in liuzhou headquarters, with more than 130 technical developers (including 10 from zhuhai company), and more than 30 employees with more than 5 years' working experience.The company's current main management system: wave ERP system;Main product development software: AutoCAD, UG, CATTIA, VESYS, EB, E3, CAPITAL, etc.We have strong ability of technology development and technology transformation.In 2017, we have developed and mass produced 16 projects for SGMW, DFLZ, GEELY, SAIC MAXUS, BYD ZOTYE and other customers, and another 51 projects are under continuous development.
11 system engineers (5 senior engineers), 15 digital and analog engineers (5 senior engineers), 12 product engineers (6 senior engineers), and 90 process engineers (30 senior engineers)
----Research & Development: Adopt APQP, FMEA, SPC process technology to predict the failure of products in advance, and develop corresponding control and detection methods;CAE assisted analysis,3D environment simulation, rapid prototyping verification, full performance test and other methods were used for product verification and confirmation.
----Production,Applying various control way、
----Quality tool application:8D、5Why、5step、Cause-Effect Graphs、Pareto Diagram 、Multifunctional group analysis meeting,etc.

The company has 14 sets of automatic crimping machines, 7 sets of manual crimping machines, 3 assembly lines and various wire harness processing equipment, which can meet the production and manufacturing of complete vehicle wire harness. At present, the manufacturing capacity of wire harness exceeds 150,000 sets/year.

Quality prevention, control, improvement

----Automatic connection machine error - proof automatic alarm control
The automation has a monitoring and alarming system, which can automatically detect the compression ratio between the crimping terminal and the wire core. It can automatically alarm when it exceeds the set range. It can also automatically alarm when the wire is not open properly
(such as broken core wire, bad peeling and line diameter discrepancy).
Slice Analysis
Terminal Cutting -> Grinding and polishing ->Caustic washing ->Photographic analysis
Compressibility=The total cross-sectional area of the crimpedback terminal and the core wire/The total cross-sectional area
of the crimped front terminal and the core wire x 100%
压接前的面积计算= N* *D2/4 + S*C1
Product test

Aiming at the abrasive tool blade wear condition, set the service life of the die blade, collect data according to the number of press joints, input the computer to collect the data, and make preventive maintenance regularly to ensure the quality of press joints.
Shuangfei has complete series laboratories, divided into Liuzhou and Hefei two experimental bases, more than 170 large-scale experimental equipment. Each laboratory can independently carry out all kinds of experiments required by the production of wire harness. Liuzhou laboratory is authorized by SGM GP-10 laboratory, and has reached the experimental standard of the Quality Supervision Bureau of the autonomous region. Hefei laboratory has passed CNAS experimental approval, which can meet the experimental requirements of European, American, Japanese and Korean car series.
Cutting plan clearly stipulates the Cutting machine production tasks and production quantity for each type during the plan period.The production activities of each type of machine should be carried out in a planned and step-by-step way and BTO system should be adopted. Cutting
The company adopts advanced wave ERP barcode scanning warehouse management system
What problems does the pull card solve?:Bulk reduction、Direct management、Waste reduction、Visual communication

——General bulk transportation:
The mode of transportation is adopted for the mass production of products in stock, and the transportation time is 72 hours to the outside warehouse;
——Rent automobile transportation:
We have a large amount of shipment. The mode of transportation is adopted when we reach the basic cargo capacity of 5T vehicles. Generally, the goods will arrive within 24 hours;
——The bus express:
For small quantity products, such as sample line, urgent materials, customer's urgent needs, etc.;It
usually arrives within 24 hours;
——Air transportation:
For customers bidding farewell to the emergency, the requirement of the same day arrival of materials, can take this way, but the cost is high, rarely used.